Author

admin

Browsing

The leaders of Armenia and Azerbaijan brushed off any threat of backlash from neighboring powers Iran and Russia following a U.S.-brokered peace accord – an agreement hailed as the start of a new era, ending more than three decades of war and hostility in the South Caucasus.

In exclusive Fox News Digital interviews, Armenian Prime Minister Nikol Pashinyan and Azerbaijani President Ilham Aliyev both praised President Donald Trump and his envoy for their role in brokering the framework agreement. They emphasized that the deal, which promised increased regional economic integration and political cooperation, is not directed at any third party – and may actually provide strategic advantages to Moscow and Tehran.

‘This is not a zero-sum game,’ Pashinyan said. The agreement ‘contains quite tangible benefits for Iran and for Russia as well.’

‘Iran would have access through railway from the Persian Gulf to the Black Sea and Russia and Iran will have opportunity to have a railway connection between the two countries.’

Russia – a long-standing ally of Armenia and a presence in the region through its border guards – welcomed peace but sent a warning about U.S. involvement. Its foreign ministry described the accord as ‘positive,’ expressing hope for stability in the Caucasus, but warned that foreign involvement should complement, not complicate, the peace process. 

The ministry emphasized that regional solutions should include neighbors like Russia, Iran and Turkey, and cautioned against repeating the pitfalls of Western-led interventions in the Middle East.

Aliyev echoed Pashinyan’s remarks and declined to see U.S. diplomatic involvement as a provocation toward Moscow. 

‘It will be very difficult for any country – whether far away or in our region – to say something bad about today’s agreement,’ he told Fox News Digital.’We’ve taken the final step toward peace.’ 

He added: ‘It’s not against anyone. It’s a connectivity project which will be one of the most important parts of international transportation.’

At the heart of the pact is the planned Trump Route for International Peace and Prosperity (TRIPP) – a roughly 27-mile transit route linking mainland Azerbaijan with its Nakhchivan exclave, passing through Armenian territory. Armenia has granted the U.S. exclusive development rights via a 99‑year lease, allowing for infrastructure projects such as roads, rail lines, pipelines, fiber optics and possibly power transmission, aimed at opening new trade and transit paths in the region.

This bold move shifts regional dynamics, offering Washington a powerful strategic foothold while bypassing traditional Russian and Iranian routes.

Iran, in contrast, has responded with hostility. 

Ali Akbar Velayati, a key advisor to Iran’s supreme leader, warned of serious consequences if the ‘Zangezur Corridor’ – as Iran calls the route – is enacted, asserting that it ‘will not become a passage owned by Trump, but rather a graveyard for Trump’s mercenaries,’ according to the semi-official news agency Tasnim.

Iran has even signaled readiness to use military means to block the route. 

Domestically, Pashinyan faces opposition. Armenian nationalists, already fierce critics of any deal with Azerbaijan, view the agreement as a betrayal. The Republican Party of Armenia has declared that Pashinyan lacks the mandate to sign such a treaty, demanding full transparency and an end to concessions made under external pressure.

Pashinyan, however, is undeterred. He said the accord could transform Armenia’s investment climate and attract foreign capital. 

‘We expect to have some criticism, and that’s part of democracy,’ he told Fox News Digital. ‘But we are confident we made the right decision.’ 

Once the dominant power in the South Caucasus, Russia is losing its grip. The war in Ukraine, mounting sanctions and resource strains have depleted its regional influence, enabling the U.S., Turkey and the European Union to expand their diplomatic reach.

Relations with Azerbaijan particularly soured following the December 2024 downing of Azerbaijan Airlines Flight 8243. Aliyev accused Moscow of accidentally shooting the passenger jet with Russian air defenses during operations against Ukrainian drones, killing 38 people. 

Aliyev told Fox News Digital he didn’t believe the incident was an intentional attack by Russian leadership, but demanded a formal admission of guilt, punishment for those responsible and full compensation – moves Russia has resisted, apologizing only vaguely for what they called a’tragic incident.’

And amid political divisions, Pashinyan finds himself in a conflict with one of the country’s most respected institutions  – the Armenian Apostolic Church, where figures like Archbishop Bagrat Galstanyan have led public protests against Pashinyan’s decision to return border villages to Azerbaijan.

On June 25, authorities arrested Galstanyan, a leading figure in the church and of the ‘Sacred Struggle’ opposition movement, accusing him of orchestrating a terrorist plot to overthrow the government. Armenia’s Investigative Committee alleged he had recruited more than 1,000 former police and military personnel to stage bombings, disrupt power grids and paralyze transportation networks. 

Pashinyan assured that the judiciary system acted independently of his government and ‘in full accordance with the law of Armenia, respecting all the rights of all people.’

This post appeared first on FOX NEWS

Purepoint Uranium Group Inc. (TSXV: PTU,OTC:PTUUF) (OTCQB: PTUUF) (‘Purepoint’ or the ‘Company’) announced a non-brokered private placement (the ‘Offering’) for aggregate gross proceeds of up to $3,000,000 from the sale of a combination of the following:

  • Saskatchewan flow-through units of the Company (each, a ‘SFT Unit‘) at a price of $0.65 per SFT Unit with each SFT Unit consisting of one common share of the Company to be issued on a ‘flow through’ basis pursuant to the Income Tax Act (Canada) (each a ‘SFT Share‘) and one common share purchase warrant (each, a ‘Warrant‘); and
  • National flow-through units of the Company (each, a ‘NFT Unit‘, together with the SFT Unit, the ‘CFT Units‘) at a price of $0.59 per NFT Unit with each NFT Unit consisting of one common share of the Company to be issued on a ‘flow through’ basis pursuant to the Income Tax Act (Canada) (each a ‘NFT Share‘, together with the SFT Shares, the ‘FT Shares‘) and one Warrant.

Each Warrant entitles its holder to purchase one common share of the Company (each a ‘Warrant Share‘) at an exercise price of $0.50 per share for a period of 24 months from the date of issuance.

The gross proceeds of the FT Shares sold under the Offering will be used for Canadian Exploration Expenses (within the meaning of the Income Tax Act (Canada)) which qualify as a ‘flow-through mining expenditure’ for purposes of the Income Tax Act (Canada) related to the exploration program of the Company to be conducted on the Company’s properties located in the Athabasca Basin, Saskatchewan. The Company will renounce such Canadian Exploration Expenses with an effective date of no later than December 31, 2025.

The completion of the Offering is subject to certain conditions including, but not limited to, the receipt of all necessary regulatory and corporate approvals, including the approval of the listing of the FT Shares and the Warrant Shares on the TSX Venture Exchange. Resale of the securities of the Company distributed under the Offering will be subject to a statutory hold period in Canada of four months and one day following the closing date of the Offering.

About Purepoint

Purepoint Uranium Group Inc. (TSXV: PTU,OTC:PTUUF) (OTCQB: PTUUF) is a focused explorer with a dynamic portfolio of advanced projects within the renowned Athabasca Basin in Canada. Highly prospective uranium projects are actively operated on behalf of partnerships with industry leaders including Cameco Corporation, Orano Canada Inc. and IsoEnergy Ltd.

Additionally, the Company holds a promising VHMS project currently optioned to and strategically positioned adjacent to and on trend with Foran Corporation’s McIlvena Bay project. Through a robust and proactive exploration strategy, Purepoint is solidifying its position as a leading explorer in one of the globe’s most significant uranium districts.

For more information, please contact:

Chris Frostad, President & CEO
Phone: (416) 603-8368
Email: cfrostad@purepoint.ca

For additional information please visit our new website at https://purepoint.ca, our Twitter feed: @PurepointU3O8 or our LinkedIn page @Purepoint-Uranium.

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this Press release.

Disclosure regarding forward-looking statements

This news release contains ‘forward-looking information’ within the meaning of applicable Canadian securities legislation. ‘Forward-looking information’ includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including the completion of planned exploration activities, the ability of the Company to complete the Offering on the proposed terms or at all, statements regarding the tax treatment of the CFT Units and the timing to renounce all Canadian Exploration Expenses, the anticipated use of proceeds from the Offering and receipt of regulatory approvals with respect to the Offering. Generally, but not always, forward-looking information and statements can be identified by the use of words such as ‘plans’, ‘expects’, ‘is expected’, ‘budget’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘anticipates’, or ‘believes’ or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will be taken’, ‘occur’ or ‘be achieved’ or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the Company’s planned exploration activities will be completed in a timely manner, that the Company will be able to complete the Offering on the terms as anticipated by management, that the Company will use the proceeds of the Offering as anticipated, and that the Company will receive regulatory approval with respect to the Offering. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s plans or expectations include the risk that the Company will not be able to complete the Offering on the terms as anticipated by management or at all, that the Company will not use the proceeds of the Offering as anticipated, that the Company will not receive regulatory approval with respect to the Offering, risks relating to the actual results of current exploration activities, fluctuating uranium prices, possibility of equipment breakdowns and delays, exploration cost overruns, availability of capital and financing, general economic, market or business conditions, regulatory changes, timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Not for Dissemination in the United States or through U.S. Newswire Services

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/262289

News Provided by Newsfile via QuoteMedia

This post appeared first on investingnews.com

GMV Minerals Inc. (the ‘Company’ or ‘GMV’) (TSXV:GMV)(OTCQB:GMVMF) is pleased to announce positive results from the updated Preliminary Economic Assessment (‘PEA’) study of the Mexican Hat Gold Project (the ‘Mexican Hat Project’), located in Cochise County, southeastern Arizona.

A National Instrument 43-101 –Standards of Disclosure for Mineral Projects (‘NI 43-101’) compliant technical report (the ‘Report’) entitled ‘Updated NI 43-101 Technical Report Preliminary Economic Assessment, Mexican Hat Project’ with an effective date of August 8, 2025 will be filed on SEDAR+ at www.sedarplus.ca under the Company’s profile within 45 days of this news release. All amounts are stated in second quarter 2025 US dollars (US$).

The Mexican Hat hosts a shallow oxide gold resource with excellent metallurgy and high recoveries, supported by a low strip ratio and minimal pre-stripping. Infrastructure is in place and the Mexican Hat Project demonstrates a robust NPV and IRR. With fast leach kinetics and low reagent consumption, the Company believes the Mexican Hat Project offers exceptional potential economics.

Highlights:

    • Based on price sensitivity analysis at approximately the current price of US$3,350 per ounce of gold, the project returns a pre-tax IRR of 106.8% (after-tax 82.5%) and a pre-tax NPV at a 5% discount rate of US$767 million (after-tax US$538.1 million) with a payback period of 1.10 years (1.3 years after-tax).
    • Base Case mine life of 10 years with total production of 597,841 ounces, averaging approximately 60,000 ounces per year.
    • Crushed mineralized material will be conveyor stacked at a rate of approximately 10,000 tonnes/day on a conventional heap leach pad.
    • Capex: US$89,997,000 (including US$15.4 million contingency).
    • Opex: US$788 million LOM with Low LOM Strip Ratio of 2.05
    • Estimated cash cost of production is US$1,354 per ounce with an all-in-sustaining cost of $1,545 per ounce inclusive of sustaining capital and additional overhead support.
    • Engineering design analysis indicates the potential to increase pit size and contained ounces with increased gold prices.

    FINANCIAL INDICATORS

    The following table summarizes the financial indicators for the Mexican Hat Project for both before and after taxes.

    Financial Indicators Before Taxes

    Values

    NPV cash flow (undiscounted)

    US$537.7M

    NPV @ 5%

    US$390.2M

    IRR %

    66.1%

    Payback (years)

    1.53

    Financial Indicators After Taxes

    Values

    NPV cash flow (undiscounted)

    US$377.9M

    NPV @ 5%

    US$268.3M

    IRR %

    50.2%

    Payback (years)

    1.82

    GOLD PRICE SENSITIVITY TABLE (US$ MILLIONS)

    The following table summarizes the pre-tax and post-tax economic results to gold price sensitivity.

    Pre-Tax and Post-Tax Sensitivity to Gold Price

    -60%

    -45%

    -30%

    -15%

    Base

    +15%

    +34%

    +45%

    +60%

    US$/troy oz Gold

    1,000

    1,375

    1,750

    2,125

    2,500

    2,875

    3,350

    3,625

    4,000

    IRR (Pre-Tax)

    18.3%

    45.0%

    66.1%

    85.0%

    106.8%

    118.7%

    134.2%

    NPV @ 5% (Pre-Tax) US$M

    -274.7

    -108.5

    57.7

    224.0

    390.2

    556.4

    767.0

    888.9

    1,055.1

    IRR (Post-Tax)

    11.3%

    33.4%

    50.2%

    65.2%

    82.5%

    91.9%

    104.2%

    NPV @ 5% (Post-Tax) US$M

    -274.9

    -117.3

    25.8

    149.3

    268.3

    387.4

    538.1

    625.4

    744.4

    INITIAL CAPITAL EXPENDITURES (US$ MILLIONS)

    Initial capital expenditures are estimated at US$89,997,000 million as detailed below:

    OPERATING COSTS

    The mine operating costs were calculated to average $3.49 per tonne mined as summarized below.

    Mine Operating Cost Center

    Unit Cost (US$/t mined)

    Owner Mining Personnel

    $0.11

    Owner Supplies & Misc.

    0.03

    Contractor Mining

    3.35

    Total Cost (Rounded)

    $3.49

    The life-of-mine operating costs were calculated to average US$20.44/tonne resource processed as summarized below.

    Operating Cost

    Cost per Tonne of Crushed Material Processed (US$/t)

    Mining

    $10.60

    Processing

    $8.79

    G&A

    $1.05

    Total Site Operating Cost

    $20.44

    MINERAL RESOURCES

    An updated Mineral Resource Estimate prepared by DRW Geological Consultants Ltd., with an effective date of August 8, 2025, was used in the PEA. Details of the Mineral Resource Estimate can be found in the Report to be filed on SEDAR+ within 45 days of this release.

    Category

    Cut-off (g/t Au)

    Grade (Au, g/t)

    Tonnes

    Gold Oz

    Strip Ratio

    Inferred

    0.20

    0.58

    36,733,000

    688,000

    2.36

    • The Mineral Resource Estimate has been constrained to a preliminary optimized pit shell, using the following parameters: SG = 2.57 gm/cc based on testwork, mining costs = $3.00/tonne, mining recovery = 98%, mining dilution = 2%, process cost = $5.00 per tonne, G&A = $1.05 per tonne, gold price = $2,500 per troy ounce, throughput at 10,000 tpd., discount rate = 5%. A cost of $0.03 was added per bench to the mining cost below the existing level surface.
    • A top cut of 32 gpt gold is applied to all zones except Zone 6 which has a top cut of 50 gpt gold.
    • Mineral Resources have been calculated using the Inverse Distance Squared method.
    • Mineral Resources constrained to optimized pit shells are not Mineral Reserves and do not have demonstrated economic viability.
    • Conforms to NI 43-101, Companion Policy 43-101CP, and the CIM Definition Standards for Mineral Resources and Mineral Reserves. Inferred Resources have been estimated from geological evidence and limited sampling and must be treated with a lower level of confidence than Measured and Indicated Resources.
    • All numbers are rounded. Overall numbers may not be exact due to rounding.
    • There are no known legal, political, environmental, or other risks that could materially affect the potential development of the mineral resources.

    MINE PLAN

    The mine plan is conceived as a conventional open pit tuck and shovel/loader operation. There are two independent pits which are developed with five-phase or pushback designs. Pit shells were designed using 6.0-meter benches with a catch bench installed every 18 meters. A bench face angle of 66° was used, resulting in an inner-ramp angle of 45° when catch benches were included. An 88% overall gold recovery has been used in this study, which was based on bottle roll and column leach test results. Base case haulage ramps are 26 meters wide and have a design gradient of 10%. Processing rates are based on a daily crushing rate of approximately 10,000 tonnes per day utilizing two stage crushing

    The mine and crushing will be operated by contractors with oversight by GMV mine management. The mine plan produces a nominal tonnage to the crushing and heap leach of 3,500 Ktonnes per year (10,000 tpd) from a total material movement of 93.8 Ktonnes for the life of mine (26,106 tpd LOM average).

    The PEA is preliminary in nature; it includes inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA will be realized. There is no Mineral Reserve at the Mexican Hat Project at this time. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Over the course of the mine life, 38.6 Mtonnes of Mineralized Resource is planned for processing out of a total material movement of 117.8 Mtonnes.

    INFRASTRUCTURE & PROCESS PLANT

    The Mexican Hat Project is located in the southeastern part of the State of Arizona, approximately 72 miles east-southeast of Tucson, and can be accessed from the Old Ghost Town Road., a gravel road extending south of the Town of Pearce or north from Gleeson Road.

    Groundwater will be used as the source of water for mining operations. No permitting restrictions or quantity issues are anticipated.

    A 69 kV powerline to site will be supplied by Sulphur Springs Valley Electric Cooperative from their power plant located 30 km north of the project site.

    The crushing plant will be operated by a contractor to produce a crushed product for heap leaching with a 25 mm top size. Pregnant solution from the heap leach will be processed in a conventional adsorption desorption recovery (ADR) plant. The process plant will produce doré gold bars.

    TECHNICAL REPORT AND QUALIFIED PERSONS

    The Report entitled Updated Preliminary Economic Assessment, Mexican Hat Project’, with an effective date of August 8, 2025 and which was prepared by the following Qualified Persons (as defined under NI 43-101), all of whom are independent of the Company, will be filed by the Company within 45 days of this release on www.sedarplus.com:

    • Mr. Brian Olson, Q.P., Samuel Engineering, Inc. (Metallurgical Test Work and Recovery, Process Plant and Process Operating Costs)
    • Mr. Steven Pozder, P.E., Samuel Engineering, Inc. (Project Economics and Infrastructure)
    • Dr. Dave Webb, Ph.D., P.Eng., P.Geo., DRW Geological Consultants Ltd. (Mineral Resource Estimate, Property Description and Location, Accessibility, Climate, Local Resource, Infrastructure and Physiography, History, Geological Setting and Mineralization, Deposit Types, Exploration, Drilling, Sample Preparation, Analysis and Security, Data Verification).
    • Mr. Thomas L. Dyer, P.E., RESPEC LLC. (Mine Design, Production Schedule, Capital and Operating Costs)
    • Mr. Francisco J. Barrios, P.E., BBA Consultants International LP (Pad Design and Loading)
    • Ms. Dawn Garcia, CPG, PG, Stantec Consulting Services Inc. (Environmental)

    All Qualified Persons have contributed to their corresponding sections in Interpretation, and Recommendations. The Qualified Persons have reviewed and approved the scientific, technical, and economic information obtained in this news release.

    For a description of the data verification process and limitations, underlying assumptions and the results of surveys and quality assurance program regarding exploration information, please refer to the Company’s existing NI 43-101 Technical Report filed on SEDAR+ entitled ‘Preliminary Economic Assessment, Mexican Hat Project’ with an effective date of October 20, 2020.

    Ian Klassen, President & CEO remarked that ‘The robust PEA confirms our contention that the project’s strong economic potential de-risks the development pathway, providing a solid foundation for advancement. The results validate the open-pit, heap-leach concept, demonstrate excellent metallurgy and recoveries, and outline a simple mining and processing strategy. With high margins, rapid payback, and straightforward engineering, the PEA positions the project well for the future, where detailed design, capital optimization, and permitting can advance with confidence.’

    2025-2026 Forward Looking Plan

    The Mexican Hat Project PEA economics justify continued investment in project development. The forward-looking plan for Mexican Hat includes work required to advance the project through Feasibility Study and into the permitting process.

    These tasks include:

    • Approx. 7000 meters of in-fill drilling to increase confidence in the current geological understanding and mineral resource estimation to sufficient level to support mineral reserve development
    • Metallurgical column, hardness, and grinding tests to further optimize and improve heap leach gold recovery, and to provide information for feasibility design work
    • Performing a trade-off study for self-mining and crushing versus contract mining and crushing
    • Geotechnical drilling and analysis to optimize pit slope design parameters
    • Conduct base-line water sampling, and update of hydrologic, cultural, and environmental studies for permitting

    About GMV Minerals Inc.

    GMV Minerals Inc. is a publicly traded exploration company focused on developing precious metal assets in Arizona. GMV, through its 100% owned subsidiary, has a 100% interest in a Mining Property Lease commonly referred to as the Mexican Hat Project, located in Cochise County, Arizona, USA. The project was initially explored by Placer Dome (USA) in the late 1980’s to early 1990’s. GMV is focused on developing the asset and realizing the full mineral potential of the property through near term gold production.

    PEA Information and Cautionary Note Regarding Inferred Mineral Resources

    The mine plan evaluated in the PEA is preliminary in nature and includes Inferred Mineral Resources, as defined by NI 43-101 that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be converted to Mineral Reserves. Additional drilling and technical studies will need to be completed in order to fully assess its viability. There is no certainty that a production decision will be made to develop the Mexican Hat Project or that the economic results described in the PEA will be realized. Mine design and mining schedules, metallurgical flow sheets and process plant designs will require additional detailed work and economic analysis and internal studies to ensure satisfactory operational conditions and decisions regarding future targeted production.

    Cautionary Note to U.S. Investors

    The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this report, such as ‘measured,’ ‘indicated,’ ‘inferred,’ and ‘resources,’ that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.

    Cautionary Statement Regarding Forward-Looking Information

    This news release includes certain ‘forward-looking information’ under applicable Canadian securities legislation. Forward-looking information include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking information may be identified by such terms as ‘believes’, ‘anticipates’, ‘expects’, ‘estimates’, ‘may’, ‘could’, ‘would’, ‘will’, or ‘plan’. Forward-looking information contained in this news release include, but are not limited to, statements or information with respect to: the results of the PEA, including the IRR and NPV, life of mine and production, capital and operating expenditures, cost estimates; permitting restrictions, and the mine plan, including infrastructure requirements and future plans; the filing of the PEA, including timing thereof, mineral resources; and future gold prices. Since forward-looking information are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties as described in the Company’s filings with Canadian securities regulators. Assumptions upon which forward-looking information contained in this news release is based, without limitation, include: results of future exploration; gold prices; accuracy of the results of the PEA, including key assumptions and methods used to determine mineral resources and the results of the PEA; the ability to obtain required permits and approvals; the ability to execute future plans; exchange rates; ability to obtain funding; and changes in regulatory or community environment; Risks, and uncertainties include: results of further exploration; risks related to mineral tenure, permits and approvals; risks related to the execution of future plans; changes in gold price and exchange rates; risks related to obtaining financing; foreign country risks; regulatory risks and liabilities; and those risks and uncertainties as further described in the Company’s filings with Canadian securities regulators which can be found on SEDAR+ at www.sedarplus.ca under the Company’s profile. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

    Dr. D.R. Webb, Ph.D., P.Geo., P.Eng. is the Q.P. responsible for this release within the meaning of NI 43-101 and has reviewed the technical content of this release and has approved its content.

    ON BEHALF OF THE BOARD OF DIRECTORS

    Ian Klassen, President
    For further information please contact:
    GMV Minerals Inc.
    Ian Klassen
    Tel: (604) 899-0106
    Email: info@gmvminerals.com

    Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    Source

    Click here to connect with GMV Minerals Inc. (TSXV:GMV)(OTCQB:GMVMF) to receive an Investor Presentation

    This post appeared first on investingnews.com

    Graphite prices have experienced volatility recently due to bottlenecks in demand for electric vehicles.

    One major factor experts are watching right now is the trade war between China and the US.

    China introduced export restrictions on certain graphite products on December 1, 2023, making it a requirement for Chinese exporters to apply for special permits to ship the material to global markets. In July 2024, the Trump administration in the US announced it would raise tariffs on battery-grade graphite imports from China to 93.5 percent.

    Another trend shaping the graphite market in 2025 has been increasing substitution of natural graphite with synthetic in battery anode production; this comes in response to Chinese exports restrictions and US tariffs on natural graphite.

    This has led to much lower prices for natural graphite, and against that backdrop, many Canadian graphite stocks have trended down. However, several graphite-focused companies have seen strong performances this year.

    Below is a look at the year’s best-performing graphite stocks on the TSXV and CSE; TSX companies were considered, but none made the cut this time. Data was obtained on July 29, 2025, using TradingView’s stock screener, and all companies listed had market caps above C$10 million at that time. Read on to learn more about their work this year.

    1. HydroGraph Clean Power (CSE:HG)

    Year-to-date gain: 384.21 percent
    Market cap: C$282.81 million
    Share price: C$0.99

    HydroGraph Clean Power produces cost-effective, high-purity graphene, hydrogen and other strategic nanomaterials.

    Graphene, a pure carbon material extracted from graphite, has myriad potential applications in industries such as transport, solar cells, medicine, electronics, energy, defense and desalination. HydroGraph has an exclusive license from Kansas State University to produce graphene and hydrogen through the organization’s patented detonation process.

    Much of HydroGraph’s news flow in 2025 has centered on strategic partnerships.

    Results from a research study conducted with Arizona State University were released in January, demonstrating that the company’s HydroGraph’s Fractal Graphene is well suited for ultra-high-performance concretes and 3D-printed structures. In February, HydroGraph announced a technical collaboration with an unnamed global leader in synthetic fiber manufacturing to assess the potential of its graphene technology in high-performance fiber applications.

    The following month, HydroGraph shared the launch of a line of advanced graphene dispersions developed in collaboration with battery materials and testing services company NEI. The products have the potential to be used to produce high-performance electrodes for use in energy storage solutions.

    The company signed a letter of intent in April that could lead to a leading North American industrial gas supplier providing it with access to large volumes of high-purity acetylene. This is an essential material in HydroGraph’s patented detonation synthesis process. Acquiring this feedstock will help the firm advance its plans to build a new graphene production facility in Texas with the capacity to produce over 350 metric tons of graphene annually.

    HydroGraph launched its Compounding Partner Program in July with the goal of attaining commercial-scale production of its high-performance Fractal Graphene in thermoplastics. According to the company, initial certified partners are testing new formulations in the automotive and packaging sectors.

    After trading in a range of C$0.22 to C$0.35 for much of the year, shares of HydroGraph jumped nearly 300 percent in a matter of days to reach a year-to-date high of C$0.99 on July 29.

    2. Black Swan Graphene (TSXV:SWAN)

    Year-to-date gain: 107.35 percent
    Market cap: C$60.02 million
    Share price: C$1.41

    Black Swan Graphene describes itself as an emerging powerhouse in the bulk graphene business.

    The company is a spinout of Mason Resources (TSXV:LLG,OTCQX:MGPHF), which owns the Uatnan graphite project in Québec and holds a 39 percent stake in Black Swan. Graphite from Uatnan is used to supply Black Swan.

    UK-based global chemicals manufacturer Thomas Swan & Co. holds a 15 percent interest in Black Swan, and brings a portfolio of patents and intellectual property related to graphene production. Through this partnership, Black Swan is building out a fully integrated supply chain of mine-to-graphene products.

    Black Swan’s share price traded sideways for much of the year before benefiting greatly from a summer surge. Shares of Black Swan reached their highest year-to-date price of C$1.52 on July 23.

    This followed a series of positive news items concerning progress on increasing commercial output. On June 3, Black Swan announced the installation of an additional production unit at its operational facility in the UK. It is working to more than triple its annual production capacity from 40 metric tons of high-quality graphene to 140 metric tons.

    Later in the month, the company signed a non-exclusive distribution and sales agreement with Indian specialty materials and polymers supplier METCO Resources. The agreement will allow METCO to “distribute and promote Black Swan’s graphene nanoplatelets and GEM advanced masterbatch products to customers across India’s industrial, packaging, automotive, and construction sectors,” as per a press release.

    Black Swan made another key announcement in the following month. On July 9, the market learned the company had secured a US patent for its breakthrough continuous graphene production process.

    3. Focus Graphite Advanced Materials (TSXV:FMS)

    Year-to-date gain: 100 percent
    Market cap: C$12.26 million
    Share price: C$0.135

    Focus Graphite Advanced Materials is both a graphite miner and a battery technology company. Its wholly owned flagship Lac Knife high-grade crystalline flake graphite project is located in Northeastern Québec.

    With a completed feasibility study, Lac Knife is one of North America’s most advanced graphite deposits. The company also holds Lac Tétépisca, the highest-purity graphite project in Québec.

    In terms of battery technologies, Focus Graphite has a patent-pending proprietary silicone-enhanced spheroidized graphite technology that is designed to enhance battery performance and efficiency.

    In late May, definition drilling at Lac Tétépisca led to an extension of the strike length of the mineralized zone to over 6 kilometers, while preliminary metallurgical testing confirmed the quality of the project’s flake graphite.

    In mid-June, the company said thermal purification testing on Lac Knife flake graphite completed by American Energy Technologies Company had resulted in refined concentrate to a purity level of 99.999 percent carbon.

    “This milestone underscores Focus Graphite’s potential to supply ultra-high-purity graphite material for nuclear energy applications, a market historically dominated by synthetic graphite and limited to a small cohort of qualifying producers,” states the company’s press release.

    Shares of Focus Graphite hit their highest year-to-date value of C$0.17 on June 17.

    Securities Disclosure: I, Melissa Pistilli, hold no direct investment interest in any company mentioned in this article.

    This post appeared first on investingnews.com

    The price of zinc was on the rise in 2024, but this year has been a different story. The metal’s value has trended down for most of 2025 on the back of increased supply and weakening demand.

    Many base metals have taken hit from lagging demand in recent years due to sticky inflation and higher interest rates, and zinc is no exception. Zinc supply has also faced pressure from higher mining and refining costs, causing some major zinc mines and smelters to suspend operations, with more possible if the current economic situation continues.

    With its important role in the steel manufacturing process, the zinc market is heavily influenced by international trade. One area of support in the last few months has been turmoil caused by the US-China trade war and tariff threats .

    Data was gathered on July 30, 2025, using TradingView’s stock screener, and only zinc stocks with market caps greater than C$50 million at that time were considered. Read on to learn more about their operations and plans.

    1. Teck Resources (TSX:TECK.A,TSX:TECK.B)

    Market cap: C$22.01 billion
    Share price: C$45.04

    Teck Resources is a major global polymetallic miner, as well as one of the world’s top zinc producers.

    The Vancouver-headquartered company produced 615,900 metric tons (MT) of zinc in concentrate in 2024, with 555,600 MT coming from its Red Dog zinc mine in Alaska. The remaining 60,300 MT came from Teck’s 22.5 percent share of zinc production from the Peru-based Antamina copper-zinc mine.

    Teck’s total 2025 production guidance for the base metal is set in a range of 525,000 to 575,000 MT. As of June 30, the company’s zinc production for the year totaled 384,000 MT.

    In addition to the sites mentioned, Teck owns the Trail operations, which it describes as ‘one of the world’s largest fully integrated zinc and lead smelting and refining complexes.’ Located in BC, Canada, the Trail operations produced 256,000 MT of refined zinc in 2024, with 190,000 to 230,000 MT of the material expected in 2025.

    Teck pays a quarterly dividend. On September 29, it will pay out a dividend of C$0.125 per share.

    2. Fireweed Metals (TSXV:FWZ)

    Market cap: C$485.11 million
    Share price: C$2.32

    Fireweed Metals is a critical metals company whose flagship Macmillan Pass zinc project is located in Canada’s Yukon. In 2023, the company acquired the Gayna River zinc project in the Northwest Territories, as well as the Mactung tungsten project, which is adjacent to Macmillan Pass and straddles the border between Yukon and the Northwest Territories. According to Fireweed, Mactung ‘hosts the world’s largest high-grade tungsten deposit.’

    Even with these new assets, the company still has a strong focus on Macmillan Pass. In fact, in November 2023, the Fireweed team, led by Dr. Jack Milton, the firm’s vice president of geology, received the Association for Mineral Exploration’s H.H. “Spud” Huestis Award for its work at the Macmillan Pass property.

    Fireweed’s best drill intersection to date from Macmillan Pass’ Boundary zone includes 143.95 meters true width at 14.45 percent zinc, including 28.71 meters at 25.52 percent zinc. In September 2024, after its largest regional exploration campaign ever at Macmillan Pass, the company released an updated resource estimate for the Tom and Jason deposits, as well as inaugural resource estimates for the Boundary zone and End zone deposits.

    Fireweed launched its 2025 field program in early June, saying it will include 12,000 meters of diamond drilling at Macmillan Pass. The work will target ‘both high-priority regional prospects and step-outs around known zinc-lead-silver-gallium-germanium deposits,’ according to a press release.

    3. Trilogy Metals (TSX:TMQ)

    Market cap: C$405.68 million
    Share price: C$2.47

    Trilogy Metals is focused primarily on copper, zinc and cobalt at its Alaskan Upper Kobuk projects, which are held by Ambler Metals, a joint venture operating company owned equally by Trilogy and South32 (ASX:S32,OTC Pink:SHTLF).

    Its most advanced zinc project is the Arctic copper-zinc-lead-gold-silver volcanogenic massive sulfide project, which is in the feasibility stage and has proven and probable reserves of 43.44 million MT grading 3.12 percent zinc.

    In addition, early stage 2023 field work at the company’s wholly owned Helpmejack project in Alaska’s Ambler schist belt outlined two target areas prospective for volcanogenic massive sulfide and shale-hosted zinc deposits.

    Trilogy had been focusing on improving access to the region with its Amber Access project, but it was rejected by the US Bureau of Land Management under the Biden administration in June 2024 due to the impact the proposed road could have on the environment and communities in the region, which have seen little development.

    However, under the Trump administration, a series of executive and secretarial orders focusing on developing Alaska’s natural resources have been enacted that could reverse this decision.

    “Recent actions taken by President Donald Trump and Interior Secretary Doug Burgum signal a positive path forward for the Ambler Road,’ Trilogy Metals President and CEO Tony Giardini said. ‘This transportation corridor is crucial not only for providing access to the minerals that are vital to U.S. national security and prosperity, but also for much-needed economic growth and job creation in Alaska. Trilogy Metals is committed to working with all stakeholders on progressing the road, to unlock the vast natural resource potential of the Ambler Mining District.”

    4. Emerita Resources (TSXV:EMO)

    Market cap: C$317.02 million
    Share price: C$1.20

    Emerita Resources has a portfolio of high-grade, large-scale polymetallic projects covering more than 26,000 combined hectares in Spain’s Iberian Pyrite Belt. The company’s flagship asset is the Iberian Belt West project, which hosts three massive sulfide deposits: La Infanta, La Romanera and El Cura.

    Emerita released a resource estimate for Iberian Belt West in May 2023. It finished environmental baseline studies the following month, and completed supporting documentation for its mining license application in December 2023.

    In July 2024, the Andalusian government granted Iberian Belt West a declaration of strategic interest, which will streamline the process of moving the project through development.

    Phase 2 metallurgical testing results for the La Romanera and La Infanta deposits released in late 2024 show that commercial-grade copper, lead and zinc concentrates can be obtained from both deposits.

    In March of this year, Emerita announced an updated resource estimate for Iberian Belt West, showing a 35 percent increase to the total indicated mineral resource tonnage and a 44 percent increase in total inferred mineral resource tonnage. Also this year, Emerita made the cut for the latest TSX Venture 50 list.

    Securities Disclosure: I, Melissa Pistilli, hold no direct investment interest in any company mentioned in this article.

    This post appeared first on investingnews.com

    Here’s a quick recap of the crypto landscape for Wednesday (August 13) as of 9:00 p.m. UTC.

    Get the latest insights on Bitcoin, Ethereum and altcoins, along with a round-up of key cryptocurrency market news.

    Bitcoin and Ethereum price update

    Bitcoin (BTC) was priced at US$122,444, up by 2.6 percent over the last 24 hours, and its highest valuation of the day. It briefly dropped to its lowest valuation of $120,414 shortly after the opening bell.

    Bitcoin has found itself at the crossroads of macroeconomic data, political influence and shifting capital flows. Inflation statistics and central bank dynamics have introduced caution, while stablecoin activity and institutional appetite are hinting at a redistribution into altcoins.

    Bitcoin price performance, August 13, 2025.

    Chart via TradingView.

    Meanwhile, Ethereum (ETH) continued to rally, up by 4.5 percent to US$4,716.60. The cryptocurrency’s lowest valuation on Wednesday was US$4,638.43, and its highest was US$4,738.59.

    Glassnode notes that ETH is a bellwether for altcoins, and its current move as capital continues to flow into exchange-traded funds suggests further upside. In an X post on Wednesday, Charles Edwards, founder of crypto quantitative digital asset fund Capriole Investments, shared data showing that 75 percent of Coinbase Global’s (NASDAQ:COIN) volume came from institutional players on Tuesday (August 12).

    He pointed to the outlook for interest rates following the release of July inflation data.

    Altcoin price update

    • Solana (SOL) was priced at US$200.74, up by 6.1 percent over 24 hours, and its highest valuation of the day. Its lowest valuation was US$195.81.
    • XRP was trading for US$3.27, up 0.1 percent in the past 24 hours and at its highest valuation of the day. Its lowest was US$3.24.
    • Sui (SUI) was trading at US$3.99, up by 2.3 percent over the past 24 hours, and its highest valuation of the day. Its lowest level was US$3.93.
    • Cardano (ADA) was trading at US$0.8827, up by 4.6 percent over 24 hours, and its highest valuation on Wednesday. Its lowest was US$0.8660.

    Today’s crypto news to know

    World Liberty Financial sets up US$1.5 billion crypto treasury

    World Liberty Financial, a digital asset venture backed by US President Donald Trump and his sons, has announced plans to establish a US$1.5 billion “crypto treasury” in partnership with ALT5 Sigma (NASDAQ:ALTS).

    Under the deal, ALT5 will raise US$1.5 billion through the sale of its own shares. The funds will go toward the purchase of World Liberty’s in-house token, $WLFI, and will also be used to set up a crypto treasury, settle litigation, pay down debt and for other corporate uses. It will ultimately hold about 7.5 percent of $WLFI tokens.

    Unnamed institutional investors and venture capital firms participated in the share sale. Crypto treasury models have grown in popularity this year amid a friendlier US regulatory stance under the Trump administration.

    The project’s leadership is heavily tied to the Trump family, with Trump himself listed as “co-founder emeritus,” and Eric, Donald Jr. and Barron Trump holding co-founder titles.

    As part of the arrangement, Eric Trump will join ALT5’s board and Zach Witkoff will serve as its chair.

    Bullish shares surge on NYSE debut

    Bullish (NYSE:BLSH), the parent company of Bullish Exchange and CoinDesk, began trading on the New York Stock Exchange on Wednesday. Shares were priced at US$37 each, an increase from an earlier target of US$33, with 30 million on offer to raise US$1.1 billion and value the company at nearly US$5.4 billion.

    Shares surged as much as 218 percent to reach US$118 on trading volume of roughly 38 million shares, before pulling back to close at US$70.65. The initial public offering pushed the company’s market cap above US$10 billion.

    Banking groups push for stablecoin loophole closure

    US banking groups, led by the Bank Policy Institute (BPI), are urging Congress to close a loophole that allows stablecoin issuers to indirectly offer yields through affiliates. They argue that while new stablecoin laws prevent issuers from directly offering yield, they don’t prohibit crypto exchanges or affiliated businesses from doing so.

    The groups contend that this circumvents the law and could lead to a US$6.6 trillion outflow of deposits from traditional banks, potentially disrupting credit flow to American businesses and families.

    Banks are concerned that yield-bearing stablecoins undermine their ability to attract deposits, which are crucial for backing loans. The offering of yield is a significant marketing draw for stablecoins, with some, like USDC, already rewarding holders on exchanges such as Kraken and Coinbase (NASDAQ:COIN).

    Safe harbor programs proposed for DeFi

    In a Wednesday letter, Andreessen Horowitz (a16z) and the DeFi Education Fund asked the US Securities and Exchange Commission (SEC) and Hester Peirce, head of the commission’s Crypto Task Force, to set up a safe harbor program from broker-dealer registration requirements for non-fungible token (NFT) and DeFi applications.

    The group said the letter was a follow up to Trump’s Working Group on Digital Assets, which called on the SEC to give certain DeFi service providers relief from registration provisions under the Exchange Act, specifically those related to broker-dealers, exchanges and clearing agencies. SEC Chair Paul Atkins also directed staff to update “antiquated agency rules and regulations” for certain crypto and blockchain applications in July.

    To avoid enforcement actions, a safe harbor provision would exempt some companies that offer crypto-related products and services from enforcement actions. a16z has sent two previous letters to the commission this year recommending safe harbors for NFTs, airdrops and network tokens.

    Securities Disclosure: I, Giann Liguid, hold no direct investment interest in any company mentioned in this article.

    Securities Disclosure: I, Meagen Seatter, hold no direct investment interest in any company mentioned in this article.

    This post appeared first on investingnews.com

    (TheNewswire)

    The CHARBONE team announced onsite construction progress at its Sorel-Tracy flagship, preparing for equipment deliveries and the start of production.

    Brossard, Quebec TheNewswire – August 14, 2025 Charbone Hydrogen Corporation (TSXV: CH,OTC:CHHYF; OTCQB: CHHYF; FSE: K47) (‘ CHARBONE ‘ or the ‘ Company ‘), North America’s only publicly traded pure-play company focused on ultra-pure green hydrogen production and distribution, is pleased to provide an update on substantial construction progress and infrastructure connections at its flagship Sorel-Tracy project.

    Electrical Interconnection Completed

    Earlier this week, a Hydro-Quebec team completed the electrical interconnection of the site. This involved connecting the distribution network to the first pole installed on-site, following the installation of the Hydro-Québec metering station three weeks earlier. Energy can now flow from the Hydro-Quebec grid along the site’s overhead power lines to the production area, paving the way for equipment installation.

    Water Supply Infrastructure Installed

    Meanwhile, the Sorel-Tracy Water Department finished excavating and installing piping to link the CHARBONE site to a 14-inch main water line. This connection will ensure enough water capacity to support all five planned project phases. With both key inputs for electrolysis—electricity and water—now secured, the site is prepared to start hydrogen production once the equipment installation is finished.

    Civil Construction Underway

    Heavy civil construction equipment has arrived on-site, and CHARBONE’s general contractor and subcontractor teams have begun work. Surveyors have finished all necessary site markings for the construction of buildings and production areas in preparation for the arrival of production equipment in the upcoming weeks.

    Environmental Stewardship

    During site preparation, the Quebec Ministry of the Environment (MELCCFP) identified a rare and endangered plant species—the ‘Three-awn grass’—on a small part of the property. In collaboration with experts from Tetra Tech, CHARBONE successfully relocated and protected the plant, ensuring it has a dedicated habitat on the site. ‘This update marks the completion of three critical milestones for our team,’ said Dave Gagnon, President and CEO of CHARBONE. ‘We are proud of the progress to date and remain on track to commence production this fall.’

    Closing of Shares for Debt Financing


    Click Image To View Full Size

    CHARBONE is pleased to announce the closing of Shares for debt settlements amounting to $118,095. The Company has settled with a arm’s length supplier $118,095 of payables through the issuance of shares. A total of 1,968,254 Shares will be issued pursuant to the closing, at a conversion price per unit of $0.06. The Company believes that the settlement of the payables through the issuance of securities is appropriate to advance towards production for its Sorel-Tracy project and the overall need to manage its cash prudently.  A formal agreement will reflect any debt settlement and will be subject to the approval of the TSX Venture Exchange. Any securities issued pursuant to a debt settlement will be subject to a statutory four-month hold period in Canada.

    Update on closing US$1.5M in Convertible Notes

    Following the Exchange’s review of the closing of US$1.5M (CA$2.1M) convertible notes announced on December 4, 2024, CHARBONE will issue 2,109,900 warrants to the placement agent. Each warrant entitles the holder to purchase one additional common share of the Company at an exercise price of $0.10 or USD equivalent.

    About CHARBONE Corporation

    CHARBONE is an integrated company specialized in Ultra High Purity (UHP) hydrogen and the strategic distribution of industrial gases in North America and the Asia-Pacific region. It is developing a modular network of green hydrogen production while partnering with industry players to supply helium and other specialty gases without the need to build costly new plants. This disciplined strategy diversifies revenue streams, reduces risks, and increases flexibility. The CHARBONE group is publicly listed in North America and Europe on the TSX Venture Exchange (TSXV: CH,OTC:CHHYF), the OTC Markets (OTCQB: CHHYF), and the Frankfurt Stock Exchange (FSE: K47). For more information, visit www.charbone.com .

    Forward-Looking Statements

    This news release contains statements that are ‘forward-looking information’ as defined under Canadian securities laws (‘forward-looking statements’). These forward-looking statements are often identified by words such as ‘intends’, ‘anticipates’, ‘expects’, ‘believes’, ‘plans’, ‘likely’, or similar words. The forward-looking statements reflect management’s expectations, estimates, or projections concerning future results or events, based on the opinions, assumptions and estimates considered reasonable by management at the date the statements are made. Although Charbone believes that the expectations reflected in the forward-looking statements are reasonable, forward-looking statements involve risks and uncertainties, and undue reliance should not be placed on forward-looking statements, as unknown or unpredictable factors could cause actual results to be materially different from those reflected in the forward-looking statements. The forward-looking statements may be affected by risks and uncertainties in the business of Charbone. These risks, uncertainties and assumptions include, but are not limited to, those described under ‘Risk Factors’ in the Corporation’s Filing Statement dated March 31, 2022, which is available on SEDAR at www.sedar.com; they could cause actual events or results to differ materially from those projected in any forward-looking statements.

    Except as required under applicable securities legislation, Charbone undertakes no obligation to publicly update or revise forward-looking information.

    Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release .

    Contact Charbone Hydrogen Corporation

    Telephone: +1 450 678 7171

    Email: ir@charbone.com

    Benoit Veilleux

    CFO and Corporate Secretary

    Copyright (c) 2025 TheNewswire – All rights reserved.

    News Provided by TheNewsWire via QuoteMedia

    This post appeared first on investingnews.com

    (TheNewswire)

    L’équipe Charbone a annoncé l’avancement des travaux de construction sur le site de son projet phare de Sorel-Tracy, se préparant aux livraisons d’équipements et au début de la production.

    Brossard (Québec) TheNewswire – le 14 août 2025 – CORPORATION CHARBONE HYDROGÈNE (TSXV: CH,OTC:CHHYF OTCQB: CHHYF, FSE: K47 ) (« Charbone » ou la « Société »), une rare compagnie cotée en bourse spécialisée dans la production et la distribution d’hydrogène ultrapur vert en Amérique du Nord, est heureuse de fournir une mise-à-jour sur les progrès substantiels de la construction et les connexions d’infrastructures de son projet phare de Sorel-Tracy.

    Interconnexion électrique terminée

    Plus tôt cette semaine, une équipe d’Hydro-Québec a terminé l’interconnexion électrique du site. Il s’agissait de raccorder le réseau de distribution au premier poteau installé sur le site, après l’installation du poste de mesurage d’Hydro-Québec trois semaines plus tôt. L’énergie peut désormais circuler du réseau d’Hydro-Québec jusqu’à la zone de production via les lignes aériennes du site, ouvrant ainsi la voie à l’installation des équipements.

    Infrastructures d’approvisionnement en eau installées

    Entre-temps, le service de ses eaux de la Ville de Sorel-Tracy a terminé l’excavation et l’installation de la tuyauterie reliant le site de Charbone à une conduite d’eau principale de 14 pouces. Ce raccordement assurera une capacité d’alimentation en eau suffisante pour les cinq phases prévues du projet. Les deux principaux apports d’électricité et d’eau pour l’électrolyse étant désormais assurés, le site est prêt à démarrer la production d’hydrogène une fois l’installation des équipements terminée.

    Travaux de génie civil en cours

    Les machineries lourdes de génie civil sont arrivées sur le chantier, et les équipes de l’entrepreneur général et des sous-traitants de Charbone ont commencé les travaux. Les arpenteurs géomètres ont terminé le marquage du site nécessaire à la construction des bâtiments et des zones de production, en prévision de l’arrivée des équipements dans les semaines à venir.

    Gestion de l’environnement

    Lors de la préparation du site, le ministère de l’Environnement du Québec (MELCCFP) a identifié une espèce végétale rare et menacée – l’Aristide à rameaux – sur une petite partie de la propriété. En collaboration avec les experts de Tetra Tech, Charbone a réussi à relocaliser et à protéger la plante, lui assurant ainsi un habitat dédié sur le site. « Cette mise à jour marque la réalisation de trois étapes cruciales pour notre équipe », a déclaré Dave Gagnon, président-directeur général de Charbone. « Nous sommes fiers des progrès réalisés à ce jour et maintenons le cap pour le début de la production cet automne. »


    Click Image To View Full Size

    Clôture d’un financement de règlement de dettes par actions

    Charbone a le plaisir d’annoncer la clôture d’une émission d’actions pour règlement de dettes totalisant 118 095 $. La Société a réglé avec un fournisseur sans lien de dépendance 118 095 $ de dettes par l’émission d’actions. Un total de 1 968 254 actions seront émises à la clôture, à un prix de conversion unitaire de 0,06 $. La Société estime que le règlement des dettes par l’émission de titres est approprié pour progresser vers la production de son projet Sorel-Tracy et pour répondre à la nécessité générale de gérer sa trésorerie avec prudence. Une entente officielle reflétera tout règlement de dettes et sera soumise à l’approbation de la Bourse de croissance TSX. Tout titre émis dans le cadre d’un règlement de dettes sera assujetti à une période de détention légale de quatre mois au Canada.

    Mise-à-jour sur la clôture de billets convertibles de 1,5 million de dollars américains

    À la suite de l’examen par la Bourse de la clôture des obligations convertibles de 1,5 M$ US (2,1 M$ CA) annoncée le 4 décembre 2024, Charbone émettra 2 109 900 bons de souscription à l’agent de placement. Chaque bon de souscription permet à son détenteur d’acquérir une action ordinaire supplémentaire de la Société à un prix d’exercice de 0,10 $ ou l’équivalent en dollars américains.

    À propos de Charbone Hydrogène Corporation

    Charbone est une entreprise intégrée spécialisée dans l’hydrogène ultrapur (UHP) et la distribution stratégique de gaz industriels en Amérique du Nord et en Asie-Pacifique. Elle développe un réseau modulaire de production d’hydrogène vert tout en s’associant à des partenaires de l’industrie pour offrir de l’hélium et d’autres gaz spécialisés sans avoir à construire de nouvelles usines coûteuses. Cette stratégie disciplinée diversifie les revenus, réduit les risques et augmente sa flexibilité. Le groupe Charbone est coté en bourse en Amérique du Nord et en Europe sur la bourse de croissance TSX (TSXV: CH,OTC:CHHYF); sur les marchés OTC (OTCQB: CHHYF); et à la Bourse de Francfort (FSE: K47). Pour plus d’informations, visiter www.charbone.com .

    Énoncés prospectifs

    Le présent communiqué de presse contient des énoncés qui constituent de « l’information prospective » au sens des lois canadiennes sur les valeurs mobilières (« déclarations prospectives »). Ces déclarations prospectives sont souvent identifiées par des mots tels que « a l’intention », « anticipe », « s’attend à », « croit », « planifie », « probable », ou des mots similaires. Les déclarations prospectives reflètent les attentes, estimations ou projections respectives de la direction de Charbone concernant les résultats ou événements futurs, sur la base des opinions, hypothèses et estimations considérées comme raisonnables par la direction à la date à laquelle les déclarations sont faites. Bien que Charbone estime que les attentes exprimées dans les déclarations prospectives sont raisonnables, les déclarations prospectives comportent des risques et des incertitudes, et il ne faut pas se fier indûment aux déclarations prospectives, car des facteurs inconnus ou imprévisibles pourraient faire en sorte que les résultats réels soient sensiblement différents de ceux exprimés dans les déclarations prospectives. Des risques et des incertitudes liés aux activités de Charbone peuvent avoir une incidence sur les déclarations prospectives. Ces risques, incertitudes et hypothèses comprennent, sans s’y limiter, ceux décrits à la rubrique « Facteurs de risque » dans la déclaration de changement à l’inscription de la Société datée du 31 mars 2022, qui peut être consultée sur SEDAR à l’adresse www.sedar.com; ils pourraient faire en sorte que les événements ou les résultats réels diffèrent sensiblement de ceux prévus dans les déclarations prospectives.

    Sauf si les lois sur les valeurs mobilières applicables l’exigent, Charbone ne s’engage pas à mettre à jour ni à réviser les déclarations prospectives.

    Ni la Bourse de croissance TSX ni son fournisseur de services de réglementation (tel que ce terme est défini dans les politiques de la Bourse de croissance TSX) n’acceptent de responsabilité quant à la pertinence ou à l’exactitude du présent communiqué.

    Pour contacter Corporation Charbone Hydrogène :

    Téléphone bureau: +1 450 678 7171

    Courriel: ir@charbone.com

    Benoit Veilleux

    Chef de la direction financière et secrétaire corporatif

    Copyright (c) 2025 TheNewswire – All rights reserved.

    News Provided by TheNewsWire via QuoteMedia

    This post appeared first on investingnews.com

    Homerun Resources Inc. (TSXV: HMR,OTC:HMRFF) (OTCQB: HMRFF) (‘Homerun’ or the ‘Company’) is pleased to announce that the Company has completed the transaction for the acquisition of the exploitation rights from Guidoni Brasil S.A. (‘Guidoni), for areas granted under a lease agreement with Companhia Bahiana de Pesquisa Mineral (CBPM) in the municipality of Belmonte, Bahia, Brazil. All tenements of the Guidoni project are fully permitted for immediate extraction mining and at a lower royalty rate than the Company’s previous silica sand supply contracts in the Santa Maria Eterna District.

    Further to the News Release dated February 12th, 2025, announcing the total and irrevocable assignment of all rights and responsibilities in favor of Homerun, of the rights to exploit the mining tenements 871.960/1992, 870.462/1999, 870.463/1999 and 873.387/2007, the Company has executed a Term of Assignment with Guidoni, with the Consent of CBPM, for the process number 036.5410.2020.0001386-11, assigning the above mineral rights, subject of bid number 004/2020, along with all its rights and obligations, to Homerun. Under the Guidoni Lease Terms with CBPM, the Company will pay CBPM an extraction royalty of R$26 (US$4.50) per tonne of extracted silica sand.

    Brian Leeners, CEO of Homerun stated, ‘In our original strategic plan two years ago, we stated that we would work methodically to consolidate control over the unique Santa Maria Eterna silica sand deposits in the Belmonte Silica District, and we continue to execute on that mandate. This process requires major effort and considerable patience while building beneficial relationships and favourable terms and I want to thank our team for their relentless efforts in this regard. We also want to thank our partners in the District, in particular CBPM, the State-owned resource company of the Government of Bahia, Brazil. These efforts continue and between ownership via CBPM leases and an ongoing partnership with a premier silica production company in Brazil, we are now in control of a significant majority of the silica sand in the District. Dialogue and negotiations continue with historic owners and transitional owners based on long-term legal issues over the portion of the District not under CBPM concessions. This resource base, combined with our vertically integrated approach from extraction through solar glass production, positions us uniquely as both the primary demand driver and supply controller for this unique material. With centuries of supply at our disposal, we’re not just participating in Brazil’s renewable energy transformation, we’re enabling it while building a defensible competitive moat that extends well beyond any single market cycle.’

    The total required payments under the Agreement are R$2,500,000 reais, to be advanced, as follows:

    • R$500,000 payable against the execution of the definitive agreement for the transfer of the Guidoni rights and obligations (PAID).

    • R$2,000,000, paid over four installments, maturing, one by one, every 6 months, from the date of payment of the first installment, adjusted by the foreign exchange rate variation from the reference rate of 1 US$ = R$ 4.9827 in relation to the actual closing exchange rate of the day before the maturing of each payment. The first of these four installments was due and paid on August 12th, 2025.

    About Homerun (www.homerunresources.com)

    Homerun (TSXV: HMR,OTC:HMRFF) is a vertically integrated materials leader revolutionizing green energy solutions through advanced silica technologies. As an emerging force outside of China for high-purity quartz (HPQ) silica innovation, the Company controls the full industrial vertical from raw material extraction to cutting-edge solar, battery and energy storage solutions. Our dual-engine vertical integration strategy combines:

    Homerun Advanced Materials

    • Utilizing Homerun’s robust supply of high purity silica sand and quartz silica materials to facilitate domestic and international sales of processed silica through the development of a 120,000 tpy processing plant.

    • Pioneering zero-waste thermoelectric purification and advanced materials processing technologies with University of California – Davis.

    Homerun Energy Solutions

    • Building Latin America’s first dedicated high-efficiency, 365,000 tpy solar glass manufacturing facility and pioneering new solar technologies based on years of experience as an industry leader in developing photovoltaic technologies with a specialization in perovskite photovoltaics.

    • European leader in the marketing, distribution and sales of alternative energy solutions into the commercial and industrial segments (B2B).

    • Commercializing Artificial Intelligence (AI) Energy Management and Control System Solutions (hardware and software) for energy capture, energy storage and efficient energy use.

    • Partnering with U.S. Dept. of Energy/NREL on the development of the Enduring long-duration energy storage system utilizing the Company’s high-purity silica sand for industrial heat and electricity arbitrage and complementary silica purification.

    With six profit centers built within the vertical strategy and all gaining economic advantage utilizing the Company’s HPQ silica, across, solar, battery and energy storage solutions, Homerun is positioned to capitalize on high-growth global energy transition markets. The 3-phase development plan has achieved all key milestones in a timely manner, including government partnerships, scalable logistical market access, and breakthrough IP in advanced materials processing and energy solutions.

    Homerun maintains an uncompromising commitment to ESG principles, deploying the cleanest and most sustainable production technologies across all operations while benefiting the people in the communities where the Company operates. As we advance revenue generation and vertical integration in 2025, the Company continues to deliver shareholder value through strategic execution within the unstoppable global energy transition.

    On behalf of the Board of Directors of
    Homerun Resources Inc.

    ‘Brian Leeners’

    Brian Leeners, CEO & Director
    brianleeners@gmail.com / +1 604-862-4184 (WhatsApp)

    Tyler Muir, Investor Relations
    info@homerunresources.com / +1 306-690-8886 (WhatsApp)

    FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE

    The information contained herein contains ‘forward-looking statements’ within the meaning of applicable securities legislation. Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. Any statements that express predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be ‘forward-looking statements’.

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

    To view the source version of this press release, please visit https://www.newsfilecorp.com/release/262485

    News Provided by Newsfile via QuoteMedia

    This post appeared first on investingnews.com